The last days of the East London Line
14th December 2007
<-- Index | Showing 1-23 of 23 pictures | Index -->
The East London Line closes on December 22nd for over two years, which will allow it to be expanded and converted from the Underground to the Overground. Here's a selection of pictures taken on the route today.

22/12/07

I've added a selection of pictures taken on the 19th September last year.

850x563
5059._Surrey_Quays._14.12.07._DG13813.jpg
 Buy Print

850x565
5056._Wapping._ELL._14.12.06._DG13823.jpg
 Buy Print

850x565
Wapping_ELL._14.12.07._DG13819.jpg
 Buy Print

850x565
5122._Surrey_Quays._14.12.07._DG13814.jpg
 Buy Print

850x1280
Whitechapel._ELL._14.12.07._DG13827.jpg
 Buy Print

850x1280
5067._Surrey_Quays._14.12.07._DG13803.jpg
 Buy Print

850x565
Canada_Water_ELL._14.12.07._DG13790.jpg
 Buy Print

850x565
Canada_Water_ELL._14.12.07._DG13794.jpg
 Buy Print

850x565
Canada_Water_ELL._14.12.07._DG13797.jpg
 Buy Print

850x561
Surrey_Quays._14.12.07._DG13800.jpg
 Buy Print

850x565
Blur._Cananda_Water._19.9.06._DG08021.jpg
 Buy Print

850x1280
Pax_and_levels._Canada_Water._19.9.06._DG08029.jpg
 Buy Print

850x565
5116._Surrey_Quays._19.9.06._DG08042.jpg
 Buy Print

850x1280
Levels._Canada_Water._19.9.06._DG08028.jpg
 Buy Print

850x560
East_London_Line._Whitechapel._6.12.01._09913.jpg
 Buy Print

850x1292
East_London_Line._Surry_Quays._6.12.01._09914..jpg
 Buy Print
5065 passes the remains of the old yard at New Cross Gate
5065 passes the remains of the old yard at New Cross Gate
850x562
5065._New_Cross_Gate._19.9.06._DG08049.jpg
 Buy Print
Battery packs ready for charging. These are used on the Clayton built electric locomotives which were used on the Waterloo and City line reconstruction.
Battery packs ready for charging. These are used on the Clayton built electric locomotives which were used on the Waterloo and City line reconstruction.
850x565
Loco_battery_packs._14.12.07._DG13810.jpg
 Buy Print
laying sidings in the works depot.
laying sidings in the works depot.
850x1280
New_Sidings._Surrey_Quays._14.12.07._DG13804.jpg
 Buy Print
Preparing the connection from the works depot to the 'main line'. This used to be a spur connecting the line with the BR network South of the river at Peckham.
Preparing the connection from the works depot to the 'main line'. This used to be a spur connecting the line with the BR network South of the river at Peckham.
850x1280
Preparing_the_new_connection._Surrey_Quays._14.12.07._DG13808.jpg
 Buy Print
Surrey Quays station on the East London Line. On the 22nd December the line closes to allow the route to be massively extended and incorporated into the London Overground. So the long - familiar Craven's stock will soon disappear.
Surrey Quays station on the East London Line. On the 22nd December the line closes to allow the route to be massively extended and incorporated into the London Overground. So the long - familiar Craven's stock will soon disappear.
850x565
Surrey_Quays_ELL._14.12.07._DG13799.jpg
 Buy Print
The end of the line. New Cross Gate
The end of the line. New Cross Gate
850x565
New_Cross_Gate_19.9.06._DG08044.jpg
 Buy Print
The works depot on the former spur from Surrey Quay towards Old Kent Rd.
The works depot on the former spur from Surrey Quay towards Old Kent Rd.
850x565
New_Depot._ELL._14.12.07._DG13806.jpg
 Buy Print